Armoniei, No. 13, Sect. 2, Bucharest

Armoniei, No. 13, Sect. 2, Bucharest

  • Consolidation works: demolition of parasitic bodies, sub-buildings for the realization of the extension of the main body and execution of the C1 extension. C2 body strengthening. Structural interventions on the main body.
  • Execution period 6 months – in execution
  • Built area 400 square meters
  • Altitude mode Sp+P+M