Selimbar, No. 1, Sect. 3, Bucharest

Selimbar, No. 1, Sect. 3, Bucharest

  • Consolidation works: lift well sub-buildings, reinforced concrete linings on the walls, modern reinforcements with Sika materials, concrete staircase construction, removal of metal constructions and construction of expansion on the reinforced concrete frame system, removal of the wooden structure and construction of the structure with structural elements from metal (mantles, doilies, chairs), installation of wooden rafters over metal elements.
  • Execution term 7 months – in execution
  • Built area 740 square meters
  • Altitude regime Sp+P+2E+M